Centraal ontsluitingspunt UZ Gasthuisberg

Ondertitel: Het centrale circulatieknooppunt accentueren met een slanke stalen luifel
Award: Genomineerd
Magazine: https://www.infosteel.be/images/magazine/info-steel-64/58/index.html
Plaats: Herestraat 49, Leuven
Opdrachtgever: Universitaire Ziekenhuizen Leuven, Leuven
Architect: AWG architecten, Antwerpen
Studiebureau: BAS, Kessel-Lo
Hoofdaannemer: Cordeel zetel Hoeselt, Hoeselt
Staalbouwer: Cordeel zetel Temse, Temse
Infosteelleden: Cordeel
Foto: BAS

Central access point for University Hospital Gasthuisberg

Award: Nominee
Tekst: A slender canopy has been built on the site of the University Hospital Gasthuisberg to accentuate the central circulation hub and guide visitors efficiently to their destination. The canopy covers the large circulation deck that incorporates the staircase and lift complex, and forms an important visual landmark at the western entrance zone. Measuring 43 x 27 m, it features a fully glazed steel structure with a large overhang to the side that provides shelter from driving rain. The construction height of the canopy decreases from 1,200 mm at the columns to 200 mm at the edges. The required structure is concentrated in 30 mm thick fins in S235 steel, which lie diagonally across the plane of the canopy and are welded together at nodes to form a single 1.4 m grid. The 16.5 m columns are made of S355 steel (type 406.4/30) and house the steel pipes for rainwater drainage and cabling for canopy lighting.
Magazine: https://www.infosteel.be/images/magazine/info-steel-64/58/index.html
Plaats: Herestraat 49, Leuven
Opdrachtgever: Universitaire Ziekenhuizen Leuven, Leuven
Architect: AWG architecten, Antwerpen
Studiebureau: BAS, Kessel-Lo
Hoofdaannemer: Cordeel zetel Hoeselt, Hoeselt
Staalbouwer: Cordeel zetel Temse, Temse
Infosteelleden: Cordeel
Foto: BAS

Centrale énergétique ECCO, Gasperich

Award: Concours Construction Acier 2017 - Nominé
Magazine: https://www.infosteel.be/images/magazine/info-steel-51/28/index.html
Video: https://www.infosteel.be/images/cca/2017/Centrale-energetique-ECCO.mp4
Plaats: Route d’Esch, Gasperich
Opdrachtgever: Ville de Luxembourg / Creos, Luxembourg
Architect: Beng Architectes Associés, Esch sur Alzette
Studiebureau: INCA Ingénieurs Conseils Associés, Niederanven
Controlebureau: Secolux, Cappellen / Luxcontrol, Esch-sur-Alzette
Hoofdaannemer: 0
Staalbouwer: 0
Ander staal: CM Attert, Boevange-sur-Attert (façades)
Infosteelleden: INCA, ArcelorMittal
Foto: Eric Chenal

© 2022 - Infosteel